| IPp1 | Climate Resilience Assessment | – | Forma sun and wind studies (RC chapter 02) | Full hazard study: extreme heat, coastal flooding and sea-level rise, sandstorms, water scarcity | To do |
| IPp2 | Human Impact Assessment | – | – | Community and guest impact study for the waterfront | To do |
| IPp3 | Carbon Assessment | – | – | Early operational and embodied carbon estimate | To do |
| IPc1 | Integrative Design Process | 1 / 0 | Multi-discipline concept; Forma studies | Formal design workshop with minutes | In design |
| LTc1 | Sensitive Land Protection | 0 / 1 | Planned Royal Commission plots (Lot 26 / 23) | Confirm land status with the Royal Commission | To do |
| LTc2 | Equitable Development | 0 / 0 | – | Not suited to a resort hotel | Not pursued |
| LTc3 | Compact and Connected Development | 0 / 1 | – | Map the uses within walking distance | To do |
| LTc4 | Transportation Demand Management | 0 / 2 | Porte-cochère drop-off | Shuttle bay; guest and staff bicycle parking; staff showers and lockers | To do |
| LTc5 | Electric Vehicles | 2 / 0 | 513 parking bays planned | 26 EV charging and 52 EV-ready bays (see EV section) | To do |
| SSp1 | Minimize Site Disturbance | – | – | Site and dune protection plan in the tender | To do |
| SSc1 | Biodiverse Habitat | 1 / 1 | Native planting palette on WFY-AR-100 | Habitat area calculation; more native planting area | In design |
| SSc2 | Accessible Outdoor Space | 1 / 0 | Dune gardens, lagoon walk, promenade, roof terraces (WFY-AR-100, 107) | Outdoor area calculation | Done |
| SSc3 | Rainwater Management | 0 / 2 | – | Permeable paving in surface parking; bioswales; harvesting tank | To do |
| SSc4 | Enhanced Resilient Site Design | 1 / 1 | Raised ground floor level | Confirm design flood level; shaded outdoor refuges | In design |
| SSc5 | Heat Island Reduction | 2 / 0 | 372 basement bays; roof PV pergola; shade trees | PV canopies over 141 surface bays; high-SRI roof and paving | In design |
| SSc6 | Light Pollution Reduction | 1 / 0 | – | Exterior lighting layout with full cut-off fixtures, no spill to the sea | To do |
| WEp1 | Water Metering and Reporting | – | – | Water meter schematic | To do |
| WEp2 | Minimum Water Efficiency | – | – | Fixture schedule with flow rates | To do |
| WEc1 | Water Metering and Leak Detection | 1 / 0 | – | Leak detection on the building management system | To do |
| WEc2 | Enhanced Water Efficiency | 4 / 2 | Drought-tolerant native planting | Low-flow fixtures; drip irrigation; TSE and condensate tank; pool covers | In design |
| EAp1 | Operational Carbon Projection and Decarbonization Plan | – | – | 25-year carbon projection | To do |
| EAp2 | Minimum Energy Efficiency | – | Shading in the envelope design | Energy model to ASHRAE 90.1 Appendix G | To do |
| EAp3 | Fundamental Commissioning | – | – | Appoint commissioning authority; owner's project requirements | To do |
| EAp4 | Energy Metering and Reporting | – | – | Energy meter schedule on the building management system | To do |
| EAp5 | Fundamental Refrigerant Management | – | – | CFC-free refrigerant specification | To do |
| EAc1 | Electrification | 0 / 3 | – | All-electric plant; heat-pump hot water; induction kitchens if the operator agrees | To do |
| EAc2 | Reduce Peak Thermal Loads | 3 / 2 | Bronze CNC screen, deep balconies, Z-plan (RC chapter 01; WFY-AR-130, 131) | Glazing specification; shading study | Done |
| EAc3 | Enhanced Energy Efficiency | 5 / 3 | LED lighting and guestroom energy management (concept) | Chiller and heat-recovery selection from the energy model | In design |
| EAc4 | Renewable Energy | 3 / 1 | Roof PV pergola (RC chapter 07; WFY-AR-107) | Size the roof array; add PV canopies over surface parking | In design |
| EAc5 | Enhanced Commissioning | 3 / 1 | – | Commissioning scope including the envelope | To do |
| EAc6 | Grid Interactive | 0 / 1 | – | Thermal storage or battery room in the basement | To do |
| EAc7 | Enhanced Refrigerant Management | 1 / 1 | – | Low-GWP refrigerant specification | To do |
| MRp1 | Planning for Zero Waste Operations | – | Back-of-house in the basement | Waste room sized for four recycling streams plus organics | In design |
| MRp2 | Quantify and Assess Embodied Carbon | – | – | Whole-building life-cycle assessment | To do |
| MRc1 | Building and Materials Reuse | 0 / 0 | – | Not applicable to a new build | Not pursued |
| MRc2 | Reduce Embodied Carbon | 2 / 2 | – | Low-carbon concrete; optimised structure; recycled steel | To do |
| MRc3 | Low-Emitting Materials | 2 / 0 | Material board WFY-AR-120 | VOC limits in the finishes schedule | In design |
| MRc4 | Building Product Selection and Procurement | 2 / 2 | Riyadh limestone and local stone (WFY-AR-120) | List of products with EPDs | In design |
| MRc5 | Construction and Demolition Waste Diversion | 2 / 0 | – | Contractor waste management plan in the tender | To do |
| EQp1 | Construction Management | – | – | Construction air-quality plan in the tender | To do |
| EQp2 | Fundamental Air Quality | – | – | ASHRAE 62.1 ventilation; sand and salt filtration at intakes | To do |
| EQp3 | No Smoking or Vehicle Idling | – | – | Smoking areas at least 7.5 m from doors and air intakes on the site plan | To do |
| EQc1 | Enhanced Air Quality | 1 / 0 | – | 3 m walk-off mats at every entrance on the plans | To do |
| EQc2 | Occupant Experience | 4 / 2 | Sea views and balconies in every guestroom (WFY-AR-105, 106) | Daylight calculation; acoustic ratings | In design |
| EQc3 | Accessibility and Inclusion | 1 / 0 | 10 accessible rooms and barrier-free routes | Accessible EV bay | Done |
| EQc4 | Resilient Spaces | 0 / 1 | – | Ballroom as refuge with backup power, cooling and water | To do |
| EQc5 | Air Quality Testing and Monitoring | 1 / 1 | – | Air-quality monitors in public areas; pre-occupancy test | To do |
| PRc1 | Project Priorities | 3 / 3 | – | Choose regional priority and innovation credits | To do |
| PRc2 | LEED AP | 1 / 0 | – | Appoint a LEED AP BD+C | To do |